Scope of Service: Brownfield Redevelopment

Brownfields Redevelopment

Working in conjunction with a major environmental consulting firm, Active developed and implemented a remedial action plan for the site. After delineation and classification of waste streams, 40,000 tons of PAH and PCB contaminated soils were removed from the site. The project was completed in four (4) weeks, and included the placement and capping of 15,000 cubic yards of contaminated soil in an embankment at the site. The site was completely regraded in preparation for proposed construction of power generation and distribution plant.